SNCR Pipework Installation

The challenge

The objective was to install 3500 meters of Geberit Mapress Stainless pipework and fittings for a Selective Noncatalytic Reduction (SNCR) solution at one of our power station clients. The project presented numerous challenges, including tight deadlines and complex installation requirements.

The outcome

Despite the challenges, our dedicated onsite team collaborated closely with the client to ensure the commissioning deadline was met. The successful installation of the SNCR solution has resulted in a reduction in NOx emissions for the client. Additionally, the improved efficiency of the system allows the site to maximize its Megawatt (MW) output, contributing to enhanced operational performance and environmental sustainability.